The screed made with AVACEM instead of with standard cement is ready for foot traffic after only 2-3 h, for tiling after 4 h, and after 24-36 h it is completely dry and ready for the installation of a parquet flooring.
For repairs of high-traffic flooring in areas that need to be put into service quickly (shops, hospitals, airports, etc.).
As a top cover for pipes that are part of an underfloor heating system.
Technical data
Colour: grey
Mixing time: 3-4 min.;
Open time of the mixture: 20-30 min.;
Application temperature: +5 °C to +35 °C;
Foot traffic is possible in: 2-3 h;
Ready for use: 24-36 h;
Ready to receive a self-levelling screed: after 4 h;
Waiting time before tile installation: 3 h;
Waiting time before parquet installation: 24-36 h;
Residual moisture content after 24 h (%): < 2
Temperature of use: -30 °C to +90 °C
Consumption rate:
AVACEM: 350-450 kg;
Sand fraction 0-8 mm: 1 m3;
Water: from 80 to 160 kg depending on the moisture in the fraction;